Free from Aegis Technologies
The Aegis Quality Guides
How to run corrective action, management review, internal audit, supplier recovery, calibration, first articles, change control, nonconformance, complaints, workforce competence and the IA9100 transition: every chapter of our twelve kit handbooks, free to read, with worked examples and our own guidance in labeled Aegis Insights.
- 249chapters
- 12handbooks
- 60worked examples
- 188Aegis Insights
A complete corrective action system: intake, containment, root cause, action, proof and escalation, with the handbook that ties it together. Overview, Aegis Insights and definitions.
- 1Why corrective action systems stallCorrective action is the part of a quality system that should get better every month.
- 2The CAPA Command workflowEvery problem moves through the same stages. The shaded boxes are gates: Yes continues down, No goes to the note on…
- 3Who does whatA corrective action system needs an owner for the system and an owner for every action.
- 4Intake and triageEverything comes in through one door: NCRs, customer complaints and escapes, internal and external audit findings…
- 5Containment and correctionContainment protects the customer while you investigate. It is not the corrective action, and it should not wait for…
- 6InvestigationPick the method for the problem, not for the form (B04). A single chain of events gets a careful 5 Whys (B06).
- 7Planning the corrective actionNot all actions are equally strong. Choose the strongest one that is practical, and say why when you choose a weaker…
- 8Proving it workedWrite the effectiveness criterion before the action goes in: what you will measure, over what window, and what result…
- 9EscalationAn action that stalls needs to reach someone who can unblock it, on a rule everyone knows in advance.
- 10Running the systemA weekly review that works has a fixed agenda: verifications due this week; actions overdue or blocked, each with one…
- 11Setting it up in thirty daysDo: Agree roles and response times with the general manager. Put every open problem and corrective action into one…
- 12For your general manager: one pageFill this in and hand it over. It says what changes, what you need, and what they will see.
- 13Worked example: one problem through the whole kitIntake (B02): customer reject report CR-118, 4 of 40 housings with an oversize bore.
- 14The kit at a glanceTool: CAPA Intake and Prioritization Tool; Containment and Corrective Action Verification Checklist; Quality Escape…
- 15Where the kit touches AS9100DClause numbers only; read the requirements in your own copy of the standard. The kit is a way of meeting them in…
Management review, formalized and standardized: the standard, the calendar, the input pack, agenda, minutes, action register and a one-slide summary. Overview, Aegis Insights and definitions.
- 1Why management reviews disappointWe have sat in a great many management reviews. The ones that don't work fail in the same few ways: Held for the…
- 2The kit and how its tools connectThe Management Review Kit is seven tools written for the review itself, and three from the wider library that feed its…
- 3The review cycleEvery review moves through the same steps, counted in working days before and after the meeting.
- 4Who does whatRole: Chair; Review coordinator; Input owners; Attendees; Action owners; Verifier; Internal auditor.
- 5Writing your standardThe Management Review Standard (AQL-F01) is a procedure written to be adopted: fill in the bracketed fields, delete…
- 6The calendar and the input ownersThe calendar and input owner matrix (AQL-F02) does two jobs. The Calendar holds the year's reviews: enter the meeting…
- 7The inputs, one by oneAS9100D clause 9.3.2 lists what the review must consider; your standard names an owner for each.
- 8Building the data packThe Input Data Pack (AQL-F03) gives every input the same small table: the measure, how it is counted, whether higher…
- 9The agendaThe agenda (AQL-F04) runs in input order, with previous actions first and the conclusions and read-back last.
- 10Running the meetingOpen on time; record attendance; approve the last minutes. Show the executive summary slide (F07): six figures and the…
- 11The minutesThe minutes record (AQL-F05) is laid out so the minutes capture outputs as they are made: attendance; the status of…
- 12Outputs and the action registerEvery review produces outputs of four kinds: improvements, changes to the quality system, resource needs and actions…
- 13The executive summary slideThe executive summary (AQL-F07) puts the quality system on one slide for top management: six figures, each with its…
- 14Objectives, risks and performance in the reviewThree inputs are strongest when they come from registers kept all year rather than assembled for the review.
- 15The annual review and extra reviewsThe first review of the year does everything a quarterly review does, plus the items that only make sense once a year…
- 16The rhythmWhen: January; Monthly; Monthly; Quarterly, minus 15 to minus 3; Quarterly, day 0; Quarterly, plus 2 to plus 5…
- 17Setting it up in thirty daysIf your next scheduled review is more than thirty days away, hold the first one anyway on the new tools, even…
- 18Worked example: one review at Meridian, through the whole kitMeridian Aerostructures adopted the Management Review Standard as QP-9.3 rev C in January 2026.
- 19What an auditor will look forAn auditor judges management review on the trail, not on one document. We prepare by walking the trail ourselves.
- 20Common pitfalls, and how we avoid themPitfall: Scheduled for the auditor; Report-out; Missing inputs; Quality chairs; Vanishing actions; Owners re-dating…
- 21For your general manager: one pageFill this in and hand it over. It says what changes, what you need and what they will see.
- 22Quick referenceChair; Frequency; Calendar; Inputs; Agenda; Open with; In the room; Minutes; Outputs; Register; Monthly; Feeds; Never.
- 23Where the kit touches AS9100DClause numbers only; read the requirements in your own copy of the standard. The kit is a way of meeting them in…
Plan the move from AS9100D to IA9100: the changes, the risks, the documents, the training and the readiness picture. IA9100 is not yet final. Overview, Aegis Insights and definitions.
- 1What the package isThe IA9100 Transition Package is a working system for moving a small or mid-sized aerospace supplier from AS9100D to…
- 2What the IAQG has published, and what it has notThe IAQG has announced that the next revision of AS9100 will be published as IA9100.
- 3How we approach a transitionEvery tool in the package follows the same few principles. They come from watching transitions go well and badly in…
- 4The transition workflowThe package runs one workflow, in two halves: before the final text is published (Phase 0 of the roadmap, AQL-H09) and…
- 5Who does whatA transition needs an owner for the whole and an owner for every line. Agree this table with the plant manager before…
- 6Getting started: the self-checkBlock an afternoon. Open the self-check (AQL-H01) and its Where the evidence lives tab, and pull the records it lists…
- 7Theme by themeFor each theme: the change items in our words, with the AS9100D clause where each sits today; the records to pull; the…
- 8Planning the workThe self-check says where you stand. Five tools turn it into a plan someone can approve, resource and check.
- 9Taking it to managementThe transition becomes a management review output when management makes a decision about it and the decision is…
- 10Internal auditInternal auditors already sample the records the themes depend on. The internal audit planning guide (AQL-H11) shows…
- 11The rhythmA monthly review that works has a fixed agenda: lines whose Next step reads Overdue, Name an owner or Band it; High…
- 12Setting it up in thirty daysDo: Run the self-check from the records. Name the quality manager's deputy. Ask the registrar and the main customers…
- 13When the final text is published: the first sixty daysWeek 1: buy the final text. Tell management it is out and that the plan will be re-read against it within a month.
- 14Worked example: one transition through the whole packageMeridian is an aerostructures machine shop of 78 people. R. Chen is the quality manager, with M.
- 15Quick referenceBands: Do now (small, cheap, helps today) · Plan it (owner and window) · Hold for the final text (wording may change).
- 16Where the package touches AS9100DClause numbers only; read the requirements in your own copy of AS9100D. The package is a way of managing the change…
- 17Mistakes we see, and what we do insteadWhat we see: The quality manual rewritten to draft wording; A transition plan with calendar dates nobody published…
- 18Questions we are askedNobody can say from a published source today. The IAQG has published key-change summaries of the draft; the final text…
Qualify, score and review suppliers, and pull a struggling one back with a 30/60/90-day recovery plan that ends in evidence, not promises. Overview, Aegis Insights and definitions.
- 1Why supplier problems become your problemsWhen a supplier fails, it is your part, your late line and your customer's escape.
- 2The kit at a glanceSixteen tools, each a working file you can use on its own, built to fit together.
- 3The supplier control workflowEvery supplier moves through the same stages. The shaded boxes are gates: Yes continues down, No goes to the note on…
- 4Who does whatSupplier control fails most often at the seams between functions: quality decides a status, purchasing never hears it…
- 5Choosing and qualifying suppliersQualification answers one question: should we buy this particular work from this particular supplier, at this site?
- 6Rating risk and setting the level of controlThe Supplier Risk Assessment Matrix (AQL-C02) rates each supplier on eight plain factors, each from 1 to 3.
- 7The approved list as a controlThe Approved Supplier List Register (AQL-C03) holds one line per supplier and site, including the sub-tier special…
- 8Flow-down, sub-tiers and special processesA supplier can only meet requirements it receives. Clause 8.4.3 lists the topics your purchase order and its quality…
- 9Measuring performanceThe Supplier Performance Scorecard (AQL-C04) scores every supplier every period on four measures, each a plain count…
- 10When something goes wrongRespond in proportion. A one-off nonconformance with an obvious, confirmed cause may need only a return and a note on…
- 11Bringing a supplier back: recoveryA recovery plan is for a supplier you need that is failing on more than one front: delivery and quality together, or a…
- 12Business reviewsThe Supplier Quarterly Business Review Template (AQL-C05) runs a one-hour review with a supplier's management in nine…
- 13Running the systemSCAR stages due this week and overdue, each with one decision: help, a new date with a reason, or escalate.
- 14Setting it up in thirty daysDo: Agree roles and the meaning of each status with purchasing and the general manager.
- 15Worked example: the supply base at Meridian Aerostructures, through the kitMeridian Aerostructures machines and assembles aerostructure brackets, fittings, housings and skin panels for Customer…
- 16For your general manager: one pageFill this in and hand it over. It says what changes, what you need, and what they will see.
- 17Quick referenceFive rules we would keep if we kept nothing else: approve a scope, not a company; read every certificate against the…
- 18Where the kit touches AS9100DClause numbers only; read the requirements in your own copy of the standard. The kit is a way of meeting them in…
The few measures that matter, a dashboard that reads in a minute, the cost of poor quality, and a recovery report leadership will act on. Overview, Aegis Insights and definitions.
- 1Why quality reporting failsEvery shop we have worked with reports something about quality every month. The trouble is rarely a lack of data.
- 2The kit and how its tools connectThe Quality Performance Kit is seven tools that feed each other. The dashboard (AQL-F08) is the front page: twelve…
- 3The monthly quality performance cycleEvery month moves through the same steps, in the same week. The shaded boxes are checks: Yes continues down, No goes…
- 4Who does whatA performance system needs an owner for the system and an owner for every measure.
- 5Choosing what to measureMeasures sit at three levels, and mixing them up is the most common reason a dashboard grows to forty lines.
- 6Collecting the dataCollect counts, never percentages: lines shipped and lines shipped on time, lots inspected and lots accepted first…
- 7Setting targets and watch limitsA target says where the business wants a measure to be. Set it from one of four starting points, and write down which…
- 8Reading performance: change or noiseEvery monthly figure moves. Product mix, holidays, one large order and plain chance move it.
- 9NCR trends: finding the one problem worth fixingThe NCR trend analysis (AQL-F09) is where the monthly meeting finds its corrective action.
- 10What poor quality costsThe cost of poor quality (AQL-F11) puts the system in the language management uses to decide.
- 11Objectives that get doneQuality objectives are the few results the business commits to for the year. The objectives register (AQL-F10) holds…
- 12Corrective action health and audit readinessTwo systems decide, more than any others, how an audit or a customer review goes: corrective action and the everyday…
- 13Reporting upChaired by the general manager, sixty minutes, the same day each month. The scorecard is the front page; everything…
- 14The rhythmSummary counts: on target, watch, off target, getting worse (5 minutes). Off-target lines, worst first: what moved it…
- 15Setting it up in thirty daysYou will not have perfect data in week two, and you don't need it. Twelve months loaded with honest gaps, marked as…
- 16Worked example: one month at Meridian, through the whole kitMeridian Aerostructures machines aerostructure housings, brackets, manifolds and skin panels, with about a $12 million…
- 17Common pitfalls, and how we avoid themPitfall: Averaging percentages; Chasing noise; Totals only; Moving targets; Composite scores; Quality owns every…
- 18For your general manager: one pageFill this in and hand it over. It says what changes, what you need and what they will see.
- 19Quick referenceCycle; Measures; Collect; Status; Signal; Stratify; Act; Cost; Objectives; Targets; Escalate; Weekly; Never.
- 20Where the kit touches AS9100DClause numbers only; read the requirements in your own copy of the standard. The kit is a way of meeting them in…
Plan the program, audit by process and by clause, classify what you find and write reports that get acted on. Overview, Aegis Insights and definitions.
- 1Why internal audit programs stop finding thingsAn internal audit program should be the plant's own early warning: the place where a weak process shows up months…
- 2The Internal Audit Execution workflowEvery audit moves through the same stages, inside a program that is planned once a year and adjusted every month.
- 3Who does whatAn audit program needs an owner, a pool of auditors, process owners who act on findings, and a general manager who…
- 4Building the programStart from your process list, not from your organization chart. The Process list tab in A06 is already filled in with…
- 5Auditors: competence and independenceA program is only as good as the people doing the audits. Build a pool large enough that no auditor does more than one…
- 6Planning an auditTwo weeks before the audit, the lead auditor fills in the plan (A06 Audit plan tab) with the process owner.
- 7Conducting the auditStart with a real job. Follow it backward to the order and forward to inspection (A07 part 8).
- 8Findings that hold upThe Audit Finding Classification Guide (A08) gives the definitions, the decision path, the major-or-minor tests and…
- 9The reportWrite the report from the checklist (A11) and issue it within ten working days of the audit.
- 10Responses, effectiveness and follow-upEvery nonconformity gets a response from the process owner on the Audit Nonconformity Response Template (A10), by the…
- 11Getting ready for external auditsA working internal audit program is most of the preparation for a registrar or customer audit.
- 12Running the programRhythm: Weekly, 15 minutes; Monthly, 30 minutes; Quarterly; Each management review; Yearly.
- 13Measuring the programMeasure: Processes audited within their interval; Audits done on the planned date; Days from audit to report; Findings…
- 14Setting it up in thirty daysDo: Agree roles with the general manager, including the contract auditor for the quality team's processes.
- 15Worked example: one audit through the whole kitMeridian Aerostructures machines aerostructure housings and brackets on five-axis and three-axis mills, two shifts…
- 16For your general manager: one pageFill this in and hand it over. It says what changes, what you need, and what they will see.
- 17Quick referenceStage: Program; Auditors; Plan; Prepare; Audit; Findings; Report; Response; Follow-up; Review.
- 18The kit at a glanceRelated resources outside the kit: the AS9100D Gap Analysis Workbook (A01) before certification or recertification…
- 19Where the kit touches AS9100DClause numbers only; read the requirements in your own copy of the standard. The kit is a way of meeting them in…
Calibration, measurement risk and out-of-tolerance impact, with the gauge studies and capability tools behind them. Overview, Aegis Insights and definitions.
- 1Why calibration systems fail auditsCalibration is the clause most shops believe they have covered. There is a list, there are stickers, and the…
- 2The kit and how the tools connectFour tools do the work. The register is the backbone; the other three hang off its lines.
- 3The calibration control workflowEvery instrument moves through the same loop for as long as it is in use. The shaded boxes are gates: Yes continues…
- 4Who does whatA measuring equipment system needs an owner for the system and a clear owner for every instrument.
- 5Building the equipment register (E01)The register is one line per instrument used to accept product or control a process.
- 6Calibration sources and certificatesMost small shops send most of their calibration out. That is sound practice, and it makes the laboratory an external…
- 7Setting and adjusting intervalsAn interval is a bet on how long an instrument stays within its limits in your conditions of use.
- 8Between calibrations: checks, handling and conditionsCalibration shows the instrument was good on one day. Interim checks show it stayed good, and they shrink the window…
- 9When a calibration fails: the impact assessment (E02)An out-of-tolerance result means every measurement the instrument made since it was last known good is in question…
- 10Proving fitness: measurement system analysis (E03, E04)Calibration compares an instrument with a standard. Measurement system analysis asks a different question: is this…
- 11Measurement uncertainty and decisions near the limitEvery measurement has some doubt in it: the instrument's own uncertainty, the reference standard's, temperature, the…
- 12Software, CMM programs and test equipmentWhen software decides acceptance, the software is part of the measurement system.
- 13Records that hold upAn auditor tests a calibration system by following a chain: from a part's inspection record to the instrument, from…
- 14The weekly and monthly rhythmThe weekly review has a fixed agenda: anything overdue or quarantined, each with one decision; instruments due in the…
- 15Measures that matterMeasure: Share of instruments in use that are in date; Out-of-tolerance results per quarter; Days from finding to a…
- 16Setting it up in thirty daysDo: Agree roles and the out-of-tolerance path with the general manager. Walk the floor and collect every instrument…
- 17Worked example: the same instruments through the whole kitMeridian Aerostructures machines aluminum housings and brackets on two shifts and inspects them in a small lab.
- 18For your general manager: one pageFill this in and hand it over. It says what changes, what you need, and what they will see.
- 19Quick referenceWhen: A new instrument arrives; Someone drops or doubts a gauge; A certificate comes back; As found is out of…
- 20Situations we meet oftenSituation: The lab adjusted the instrument and reported only as-left data; An employee's own micrometer was used on…
- 21The kit at a glanceTool: Calibration and Measurement Risk Register; Out-of-Tolerance Impact Assessment; MSA Planning Worksheet; Gage R&R…
- 22Where the kit touches AS9100DClause numbers only; read the requirements in your own copy of the standard. The kit is a way of meeting them in…
First article planning, AS9102 package checks and the readiness review before the first production run. Overview, Aegis Insights and definitions.
- 1Why launches and first articles go wrongA first article inspection is meant to prove that the production process makes a part that meets every requirement.
- 2The kit and how the tools connectThe kit has eight tools that follow a part from the order to steady production, and it leans on eight related tools…
- 3The workflowEvery new or changed part moves through the same stages. The shaded boxes are gates: Yes continues down, No goes to…
- 4Who does whatA launch needs an owner for the launch as well as owners for each piece of it. Agree this table with your plant…
- 5First article inspection in plain wordsAS9102 sets the requirements for aerospace first article inspection: what it is, when it is required, and what the…
- 6Order review and first article planning (D07)The first article starts at order review. Three questions get answered for every order: what does the order require…
- 7Inspection planning and key characteristics (E11, D16, E07)With the drawing ballooned, the inspection plan (E11) gets one line per balloon: the requirement as the drawing states…
- 8The traveler (E09)The traveler carries the job from the saw to the shipping dock. It is where the inspection plan, the control plan and…
- 9Tooling, equipment and programs (E10)AS9100D expects production equipment, tools and software programs to be validated before they are released for…
- 10The production readiness review (D09)The production readiness review decides, on evidence and before the first article, whether every part of the launch is…
- 11First piece at every setup (E12)A first article proves the process once. A first piece proves each setup, every time.
- 12Running the first articleIf the planning and the readiness review were done, the first article day is short.
- 13Reviewing and submitting the package (D08)D08 is the review between the last measurement and the signature. It starts with counts on its Reconciliation tab…
- 14After approval: into steady productionApproval is not the end of the launch. Four habits keep the process where the first article proved it: Key…
- 15The weekly and monthly rhythmThe weekly launch review has a fixed agenda: first articles late or waiting; packages due for review; readiness…
- 16Measures that matterMeasure: First articles approved first time; First articles completed on the planned date; Characteristics…
- 17Setting it up in thirty daysDo: Agree the roles with the plant manager. Start the FAI plan log with every first article planned, open or waiting…
- 18Worked example: one new part through the whole kitMeridian Aerostructures received its first production order for hinge fitting 8140-220 rev A from Customer A…
- 19For your plant manager: one pageFill this in and hand it over. It says what changes, what you need, and what they will see.
- 20Quick referenceOne page to pin where launches are planned. The first article is made on the production process.
- 21Situations we meet oftenThe questions that come up on almost every launch, and how we answer them. Where a customer's requirement says…
- 22Where the kit touches AS9100D, AS9102 and AS9145Clause and document numbers only; read the requirements in your own licensed copies.
One change traced from the drawing to the machine: impact assessment, configuration records and documented information control. Overview, Aegis Insights and definitions.
- 1Why changes go wrong in small shopsMost aerospace machine shops do not have a configuration management problem in the sense a prime contractor means it.
- 2Three controls, one systemThis kit treats three things that are often run separately as one system. Each answers a different question, and each…
- 3The kit at a glanceFive tools make up the kit. Each is a standalone Excel workbook with its own worked example from Meridian…
- 4Who does whatAgree this table with your general manager before you start. A shop of forty to a hundred people does not need a…
- 5The change boardA change board sounds like a large-company habit. In a small shop it is a fifteen-minute standing meeting, once a…
- 6Configuration identification: what a part isConfiguration identification means knowing, for every part you make, the released revision and every document…
- 7Customer and engineering changesCustomer changes reach a supplier in more ways than most change procedures admit.
- 8Process changesA process change is any change to how a part is made or inspected without changing the part's definition: a machine…
- 9Supplier changes and flow-downChanges cross the supply chain in both directions. Your changes flow down: a new drawing revision or specification…
- 10Documented information controlEvery change ends in documents and programs: new revisions to approve, issue and put at the point of use, and old ones…
- 11Electronic control of programs and documentsMost old revisions that reach a machine travel electronically: a program in control memory, a file on a USB stick, a…
- 12When an old revision gets throughEven a good system will sometimes find product made to a superseded revision. The response has two jobs: protect the…
- 13Running the systemRhythm: Daily; Weekly, 15 minutes; Weekly; Monthly; Quarterly.
- 14Setting it up in thirty daysDo: Agree roles and the change board with the general manager. Set up one front door for customer changes.
- 15Worked example: one change through the whole kitMeridian Aerostructures machines bracket 5120-100 for Customer A (example). On September 29, 2026 the customer…
- 16What auditors ask, and where the answer isRegistrar and customer auditors test configuration and change control by picking a part or a recent change and…
- 17For your general manager: one pageFill this in and hand it over. It says what changes, what you need, and what they will see.
- 18Quick referenceKeep this page at the change board. Who owns it, and is it on the log?. Is every impact line answered, with none Not…
- 19Where the kit touches AS9100DClause numbers only; read the requirements in your own copy of the standard. The kit is a way of meeting them in…
Segregate, record, disposition and close nonconforming product, with the authorizations use-as-is and repair need. Overview, Aegis Insights and definitions.
- 1Why nonconformance systems leakNonconforming product is the part of a quality system that touches real parts, real money and real customers every day.
- 2The kitFive tools, each doing one job, sharing one set of NCR numbers. The log is the spine; everything else hangs off a line…
- 3The workflowEvery nonconformance moves through the same seven stages, set out in the table and then the chart.
- 4Who does whatA nonconformance system needs an owner for the system and a named person at every step.
- 5Finding and recordingThe NCR is written once and read many times: by the board, by the customer's engineer, by the corrective action team…
- 6Identification, segregation and the hold areaNonconforming and suspect product is identified where it is found and kept where it cannot be used or shipped by…
- 7ContainmentContainment protects the customer while the cause is being found. It does not wait for the cause, and it is not…
- 8Dispositions and who may authorize themThere are six outcomes for nonconforming product. Each has a meaning, an authority and a record.
- 9Running the material review boardThe board meets every week at a fixed time, for thirty to forty-five minutes, whether or not it feels busy.
- 10Use-as-is and repairThese two dispositions are where the system carries the most risk and draws the most audit attention.
- 11Scrap, returns and customer propertyScrapped product is marked conspicuously and permanently, or kept under positive control, until it is physically made…
- 12Suspect counterfeit parts and suspect materialA certificate that does not match the marking, a marking that looks altered, a part from a source nobody can trace…
- 13When nonconforming product has already shippedThe moment you know or suspect that nonconforming product has been delivered, three things happen in the same hour…
- 14When a nonconformance needs a corrective actionNot every NCR needs a corrective action; every NCR needs the decision, recorded as Yes or No on the log.
- 15Cost and trendsTwo numbers per NCR, where it was found and what it cost, turn the log into the strongest argument a quality manager…
- 16RecordsThe nonconformance records show what was found, what was decided, by whom, with what authority and approvals, what was…
- 17The rhythmWhen: Every shift; Daily; Weekly, before the board; Weekly, 30 to 45 minutes; Monthly; Quarterly.
- 18Setting it up in thirty daysA day-by-day start for the first week, for a quality manager doing this alone.
- 19Your nonconforming product procedure: what it should sayThe kit runs the process; your procedure says how your company has decided to run it.
- 20The findings we see most, and the fixFrom audits of small and mid-sized aerospace shops, these are the nonconformance findings that come up again and again.
- 21Worked example: October at Meridian AerostructuresMeridian Aerostructures machines brackets, housings, fittings, manifolds and skin panels, mostly build-to-print for…
- 22What an auditor samples, and where the answer isThe auditor asks: Show me your nonconforming product. Is it all identified?; Who authorized this disposition, and were…
- 23Quick reference: nonconforming productAge limit: [10] working days in the cage without a disposition. Board: [day and time]. Cage key holders: [names].
- 24For your plant manager: one pageFill this in and hand it over. It says what changes, what you need, and what they will see.
- 25The kit at a glanceTool: Nonconformance Management Log; MRB Disposition Record and Log; Nonconforming Product Segregation Checklist…
- 26Where the kit touches AS9100DClause numbers only; read the requirements in your own licensed copy of the standard.
Log, contain, investigate and answer a customer complaint, and keep score of escapes by customer. Overview, Aegis Insights and definitions.
- 1Why complaint handling goes wrongA customer complaint is the most direct signal a quality system gets: the customer, in writing, telling you where you…
- 2What is in the kitFive tools, each built for one part of the work, and this handbook to run them as one system.
- 3The complaint response workflowEvery complaint, whatever its type, moves through the same stages. The shaded boxes are decisions: Yes continues down…
- 4Who does whatComplaint handling crosses departments, and most of its failures happen at the handoffs.
- 5The first twenty-four hoursWhat happens on the first day decides most of what follows. Three things must happen: the complaint is captured…
- 6Validating the complaintBefore you contain and investigate at full scale, check the claim. Validation is not about proving the customer wrong…
- 7Containment and telling the customerContainment protects the customer while you find the cause. It is not the corrective action, and it does not wait for…
- 8InvestigationFit the method to the complaint, not to the form. The complaint log's Substantiated and Escape columns, and the…
- 9Writing the responseThe response is what the customer's supplier quality engineer reads, judges and files.
- 10Verifying and closingThe customer's acceptance closes the correspondence, not the complaint. Keep the complaint open on the log until the…
- 11Escapes and the customer's scorecardThe customer keeps score whether or not you do. The scorecard and escape tracker (AQL-B16) puts the customer's view…
- 12Delivery, documentation and service complaintsNot every complaint is about a dimension. Late shipments, wrong or missing certificates, mixed lots, wrong labels…
- 13Complaints that need special handlingMost complaints follow the workflow as drawn. A few carry more risk or more parties, and they need more from the first…
- 14When a customer's status drops: the recovery planA move to Conditional or Probation status usually comes with the customer's own requirements: a written plan by a…
- 15Running the systemA weekly complaint review that works has a fixed agenda, in this order: lines late right now (each gets a date or an…
- 16Setting it up in thirty daysDo: Agree roles, the front door and the one-voice rule with the general manager. Set your response times.
- 17For your general manager: one pageFill this in and hand it over. It says what changes, what you need, and what they will see.
- 18Worked example: one escape through the whole kitOn Tuesday, September 15, 2026, Customer A (example) stopped its assembly line when three fittings from Meridian…
- 19Quick reference: one pageStage: Receive; Acknowledge; Stop the flow; Validate; Contain; Investigate; Respond; Rejected?; Verify; Close; Learn.
- 20The kit at a glanceTool: Customer Complaint Log and Response Tracker; Customer Complaint Response Letter Template; Quality Escape…
- 21Where the kit touches AS9100DClause numbers only; read the requirements in your own copy of the standard. The kit is a way of meeting them in…
Show competence, not attendance: the matrix, operator authorization, retraining done right and training that is checked for effect. Overview, Aegis Insights and definitions.
- 1Why workforce competence systems failCompetence is the quality system's most important resource and usually its least managed.
- 2What is in the kitFive tools built for this kit and one from the IA9100 Transition Package, with this handbook to run them as one system.
- 3The competence systemCompetence moves through the same stages for every skill and every person. The shaded boxes are decisions: Yes…
- 4Who does whatRole: Quality manager; Production manager; Supervisors and leads; Trainers; Assessors; HR; General manager.
- 5Defining the skillsBuild the skills list from the product, not from job titles. Walk each area's travelers and inspection plans, and at…
- 6Levels and assessmentUse one scale for every skill so the matrix can be read across: NR not required for the role; 0 required but not…
- 7Inspection and measurement competenceInspectors are the last people between a defect and the customer, so their competence deserves its own attention.
- 8Coverage and shiftsThe Coverage tab counts, for each skill, how many people are qualified overall and on each shift, against the minimum.
- 9Authorizations and stampsSome tasks carry authority: accepting product, releasing a first piece, signing a certificate, deciding a disposition…
- 10Training that changes the workMost training in small shops is on the job, and it works when it is structured. The four steps that have stood the…
- 11Writing a job breakdown for on-the-job trainingOn-the-job training is only as good as the trainer's sense of what matters. A one-page job breakdown fixes that: the…
- 12Evaluating trainingThe Training Effectiveness Evaluation (G04) asks one question of every training that matters to the product: did it…
- 13After a quality failure: the retraining gateWhen a nonconformance, an escape or an audit finding involves a person, the first proposal is often to retrain them.
- 14AwarenessAS9100D expects people to be aware of the quality policy and objectives that apply to them, their contribution to…
- 15New hires, transfers, contractors and temporary staffWho: New hire; Transfer to a new area; Contract or agency staff; Returning after a long absence.
- 16Succession and knowledge captureSome knowledge sits with one person: how Mill 7 really needs to be proved out, which customer wants what on a…
- 17External providersCompetence requirements reach your suppliers too. Where a supplier performs a special process, an inspection or a test…
- 18What an auditor will ask, and where the answer isRegistrar and customer auditors test competence by picking a person at work and following the evidence.
- 19Hard situations, and how we handle themThe system works smoothly most weeks. These are the situations that test it, and the way we have learned to handle…
- 20Running the systemA monthly competence review that works has a fixed agenda, in this order: skills with nobody qualified or one person…
- 21Setting it up in thirty daysDo: Agree roles. Walk the travelers and inspection plans with the supervisors and write the skills list with minimums.
- 22For your general manager: one pageFill this in and hand it over. It says what changes, what you need, and what they will see.
- 23Worked example: second shift at Meridian, August to October 2026On August 7, 2026, the second-shift setup technician at Meridian Aerostructures left.
- 24Quick reference for supervisors: one pageSituation: Assigning work; Nobody qualified on the shift; Someone is ready to be assessed; A task carries a stamp…
- 25The kit at a glanceTool: Training and Competence Matrix; Operator Qualification and Authorization Record; Retraining After a Quality…
- 26Where the kit touches AS9100DClause numbers only; read the requirements in your own copy of the standard. The kit is a way of meeting them in…
No chapter matches that yet. Try another word, or book a call and we'll point you to the right place.
Need a little more guidance?
If you're looking for several resources, want help putting one of our kits to work, or aren't sure where to start, let's talk.
Book a complimentary 30‑minute Aegis Quality Guidance Call
We'll talk through what's happening in your quality department, pick the resources that fit your situation, and work out practical next steps.
And honestly, you may not be a fit for our Audit Defense Pack or IA9100 Gap Analysis. That's perfectly fine. I'd still be happy to help you find a better way forward.
No sales pressure. No obligation. Just a conversation with someone who understands aerospace quality.
James T. Porter, Executive Director, Aegis Technologies
Every tool the guides name is free in the Aegis Quality Resource Library. When you want the whole picture from the records you already keep, that's what the AeroAssure Audit Defense Pack and the IA9100 Transition Gap Analysis do.