Free quality tools from Aegis: templates, kits and guides you can use today →

The FAI and Production Readiness Kit HandbookChapter 22 of 22

Where the kit touches AS9100D, AS9102 and AS9145

Clause and document numbers only; read the requirements in your own licensed copies. The kit is a way of meeting them in practice, not a substitute for them.

TopicReferenceIn this kit
Operational planning, critical items and key characteristicsAS9100D 8.1Readiness review, inspection plan, key characteristic register
Operational risk managementAS9100D 8.1.1Process risk review and launch risks in the readiness review
Configuration managementAS9100D 8.1.2Revisions on the trigger screen, traveler and package
Review of requirementsAS9100D 8.2.3Order review and the first article clauses
Control of external providersAS9100D 8.4Approved sources, flow-down, special process approval
Control of productionAS9100D 8.5.1Traveler, first piece, control plan
Equipment, tools and software programsAS9100D 8.5.1.1Equipment register, validation records
Special processesAS9100D 8.5.1.2Special process sources on the readiness review and Form 2
Production process verificationAS9100D 8.5.1.3First article planning, running and review
Identification and traceabilityAS9100D 8.5.2Serial numbers, certificates traced to the part
Control of changesAS9100D 8.5.6Triggers from changes; partial first articles
Release of productsAS9100D 8.6Inspection plan; hold points; approval before shipment
Nonconforming outputsAS9100D 8.7NCRs during the first article and at first piece
Monitoring and measuring resourcesAS9100D 7.1.5Gauge check, calibration, measurement studies
First article inspectionAS9102Forms 1, 2 and 3; ballooned drawing; full and partial
APQP and PPAPAS9145Readiness review, process risk review, control plan, measurement studies, capability, first article

Need more than one resource, or not sure where to start? Book a complimentary 30-minute Aegis Quality Guidance Call. We'll find the tools that fit your situation and a sensible place to start. No sales pressure, no obligation.

A management aid, not certification or a registrar audit. Using it does not by itself show conformity to AS9100D or any other standard, and your customers' requirements may add to it.

Clause numbers refer to AS9100D (SAE AS9100 Rev D) unless another document is named. The standards' text is not reproduced here: use your own licensed copy.

Aegis Insights are our own guidance, labeled wherever they appear: how we approach this work, not a requirement of any standard or customer.