Reading performance: change or noise

Every monthly figure moves. Product mix, holidays, one large order and plain chance move it. The skill in reading a quality report is telling the moves that mean something from the ones that don't. The kit uses a few plain rules, all of them standard and none of them ours alone:

  1. Status on three months, warning on one. The dashboard sets each measure's status on the last three months and shows the latest month beside it. One month off target with the three-month figure on target is usually noise; three months off target is a change.
  2. Direction against the three months before. Better, worse or no change. A measure on target and getting worse deserves a comment before it goes off target.
  3. Months on target out of twelve. The plainest measure of whether a target is met as a habit.
  4. Control limits for counts. The NCR trend (AQL-F09) works out a center line and an upper limit the way a c-chart does. A month above the limit, or eight months in a row above the center line, is a signal worth investigating. A month that is merely worse than the last is not.
  5. Stratify before concluding. Split a total by shift, supplier, operation, part or customer. The total can improve while one part of it gets worse.

When a line is off target, the comment against it answers three questions in one or two sentences: what moved it (named: the part, the supplier, the shift), whether it is a signal or noise, and what is being done. 'Supplier on-time delivery off target and getting worse: Supplier F, our only anodizer, at 71 percent; second source approved' is a comment management can act on. 'Supplier delivery down' is not.

Reading each starting measure

What usually moves each of the twelve starting measures in a machining or aerostructures shop, where to look first, and the kind of action that usually follows. Starting points from our own experience; your shop will add its own.

MeasureWhat usually moves itLook first atTypical action
On-time deliverySupplier and outside-process delays; capacity on one machine; first articles; promise dates set without checking capacityThe late-line cause log, split by causeFix the largest cause: a second source, a weekend cell, capacity checked at order entry
Customer returns (PPM)One escape event with many parts; part mix; returns of suspect partsThe return log by event, not by partTreat each event as an escape with a corrective action
Customer escapesInspection that samples too lightly; a new part; packing and labelingThe escape's escape causeCorrective action on both causes (AQL-B12, AQL-B03)
Customer complaintsPaperwork (certificates, first article reports), delivery, serviceThe complaint log by typeFix the process behind the type that repeats
First-pass yieldNew parts and revisions; setups; one problem machineLots reworked, by part and operationSetup and first-piece discipline; capability on the problem feature
Internal NCRs raisedSetups, tool wear, handling, a new machine or shiftThe cause Pareto and the shift column (AQL-F09)One corrective action on the top cause
Scrap and rework (% of sales)A few expensive scrap events; sales falling while scrap holdsThe cost columns on the ParetosAn improvement case on the costliest cause (AQL-F11)
Corrective actions shown effectiveEffectiveness checks never booked; actions closed on implementationThe aging dashboard's closed versus shown effective (AQL-B09)Book every check on the day the action is implemented
Corrective actions past dueActions blocked outside the owner's control; dates set before the cause was knownOverdue actions by stage and ownerUnblock or escalate; reset the date once, with a reason
Supplier on-time deliveryOne supplier, often a single source or outside processorLate lines by supplierEscalation, a recovery plan, a second source
Receiving rejects (PPM)One supplier's recurring defect; a large lot rejected wholeRejects by supplier and defectSupplier corrective action; tightened receiving until it holds
Internal audits done to planAuditors pulled into production; audits clustered at year endThe audit program by monthSpread the program; train a second auditor

Need more than one resource, or not sure where to start? Book a complimentary 30-minute Aegis Quality Guidance Call. We'll find the tools that fit your situation and a sensible place to start. No sales pressure, no obligation.

A management aid, not certification or a registrar audit. Using it does not by itself show conformity to AS9100D or any other standard, and your customers' requirements may add to it.

Clause numbers refer to AS9100D (SAE AS9100 Rev D) unless another document is named. The standards' text is not reproduced here: use your own licensed copy.

Aegis Insights are our own guidance, labeled wherever they appear: how we approach this work, not a requirement of any standard or customer.