Every new or changed part moves through the same stages. The shaded boxes are gates: Yes continues down, No goes to the note on the right.
- Order review: read the drawing, the order and the quality clauses. Screen for first article triggers (D07).
- Decision: Does the job need a first article (new part, change, lapse, customer request)? If yes, continue to the next step.No:Record the reason on the trigger screen. Every setup still gets a first piece (E12).
- Decision: Production readiness review: is every part of the launch ready to make product (D09)? If yes, continue to the next step.No:Close the Not ready items, then a short re-review. No first article on an unready process.
- First piece at every setup, released on evidence (E12).
- Run the first article on the production process; measure every balloon; record values.
- Decision: Does every characteristic conform? If yes, continue to the next step.No:NCR; fix the cause; re-verify the affected characteristics on a corrected part (D19).
- Decision: Package review before signing (D08). Complete, with every count reconciled? If yes, continue to the next step.No:Fix each finding, look again, then sign.
| Stage | Purpose | Tools | Output | AS9100D |
|---|---|---|---|---|
| Order review | Know what the order requires and whether it triggers a first article | D07 | Trigger screen, scope decision | 8.2.3 |
| Plan | Plan the first article and the inspection of every characteristic | D07, E11, D16, E07 | Planning checks, inspection plan, KC controls | 8.1, 8.6 |
| Build the process | Make the process able to make the part | E09, E10, E01 | Released traveler, validated tooling and programs | 8.5.1, 8.5.1.1 |
| Readiness review | Decide, on evidence, whether to proceed | D09 | Go, Go with conditions, or No go | 8.1 |
| Setups | Release each setup on evidence | E12 | First-piece records, setup log | 8.5.1 |
| First article | Prove the production process | D07, D19 | Completed AS9102 record | 8.5.1.3 |
| Package review | Send a package that is complete and right | D08 | Reviewed, signed package | 8.5.1.3, 8.6 |
| Production | Keep the process where the first article proved it | D16, E07, E12, D07 | KC data, capability, trigger watch | 8.5.1, 8.5.6 |
Need more than one resource, or not sure where to start? Book a complimentary 30-minute Aegis Quality Guidance Call. We'll find the tools that fit your situation and a sensible place to start. No sales pressure, no obligation.
A management aid, not certification or a registrar audit. Using it does not by itself show conformity to AS9100D or any other standard, and your customers' requirements may add to it.
Clause numbers refer to AS9100D (SAE AS9100 Rev D) unless another document is named. The standards' text is not reproduced here: use your own licensed copy.
Aegis Insights are our own guidance, labeled wherever they appear: how we approach this work, not a requirement of any standard or customer.