The IA9100 Transition Package GuideChapter 1 of 18

What the package is

IA9100 draft: based on the IAQG's published changes. IA9100 is not yet final, and the final text may change these topics and clause numbers.

The IA9100 Transition Package is a working system for moving a small or mid-sized aerospace supplier from AS9100D to IA9100: fourteen tools, this guide, and one worked example that runs through all of them. It is built for the situation most Tier 2 and Tier 3 suppliers are in today: a customer bulletin has mentioned IA9100, the general manager has asked whether the shop is ready, the quality team is one to three people, the next AS9100D audit still has to be passed, and there is no final text to buy.

The package does three things. It tells you where you stand, from your own records, against the changes the IAQG has published for the draft. It turns that into a plan that is banded, owned and timed against the month the final text is published, with the risks, the documents and the training laid out. And it gives you the way to run it: the monthly review, the management briefing, the internal audit, and the steps to take when the final text arrives.

AQLToolFormatUse it for
H01IA9100 Transition Self-CheckExcel, PDFFirst: where you stand, from the records, in an afternoon
H02AS9100D-to-IA9100 Transition Planning MatrixExcel, PDFThe plan: every change item against your system, banded, owned, timed
H08IA9100 Change Impact AssessmentExcel, PDFWhat each change touches and costs; a brief for each High
H04Transition Risk RegisterExcel, PDFWhat could stop or slow the transition
H05IA9100 Document Review PlannerExcel, PDFEvery controlled document read against the themes
H06Transition Training Needs AssessmentExcel, PDFWho needs to know or do what, and the hours
H07Transition Management Review BriefingPowerPoint, PDFTaking the transition to management review
H10IA9100 Executive Readiness ScorecardExcel, PDFThe transition on one page for executives, each quarter
H09Transition Implementation RoadmapPDF, WordThe phases and gates, counted from the final text
H11IA9100 Internal Audit Planning GuidePDF, WordAuditing the themes now, and against the final text later
D02IA9100 Product-Safety Change and Hazard ScreenExcel, PDFProduct safety: the change screen, hazards, roles, notification
D04IA9100 Counterfeit-Parts Risk and Obsolescence TrackerExcel, PDFCounterfeit parts: sources, risk bands, obsolescence, alerts
H03IA9100 Sub-Tier Flow-Down and Level-of-Control RegisterExcel, PDFSub-tier control: PO terms, levels of control, sub-tier lists
D14IA9100 FOD and Planning CheckExcel, PDFFOD, phased planning, process verification, measurement

Every tool is free to use and change inside your organization, in an editable format (Excel, Word or PowerPoint) and as a fillable PDF. Every tool carries a worked example from the same plant, Meridian Aerostructures, with the same people and the same figures, so you can follow one transition from the first afternoon to the plan in front of management.

Need more than one resource, or not sure where to start? Book a complimentary 30-minute Aegis Quality Guidance Call. We'll find the tools that fit your situation and a sensible place to start. No sales pressure, no obligation.

IA9100 draft: based on the IAQG's published changes. IA9100 is not yet final, and the final text may change these topics and clause numbers.

A management aid, not certification or a registrar audit. Using it does not by itself show conformity to AS9100D or any other standard, and your customers' requirements may add to it.

Clause numbers refer to AS9100D (SAE AS9100 Rev D) unless another document is named. The standards' text is not reproduced here: use your own licensed copy.

Aegis Insights are our own guidance, labeled wherever they appear: how we approach this work, not a requirement of any standard or customer.