Free quality tools from Aegis: templates, kits and guides you can use today →

The Calibration Control Kit HandbookChapter 8 of 22

Between calibrations: checks, handling and conditions

Calibration shows the instrument was good on one day. Interim checks show it stayed good, and they shrink the window of an impact assessment from months to days.

InstrumentInterim check we useHow oftenRecorded where
Calipers and micrometersZero check; one gauge block near the most-used sizeStart of shift; weekly block checkCheck sheet at the station
Height gaugesA gauge block near the most-used heightDailyLab start-up sheet
Bore gaugesSet and check on the ring masterBefore each useNot recorded unless the setting is off
CMMProbe qualification; a reference artifact measured and chartedEach start-up; weeklyCMM log; artifact chart
Torque toolsCheck on a torque analyzerBefore critical workTorque check log

A failed interim check is treated like an out-of-tolerance calibration: stop using the instrument, quarantine it, and open an assessment from the last good check. This is where interim checks pay for themselves: the window is one day, not six months.

Handling, storage and conditions

  • Instruments are stored in their cases or protected racks, away from coolant and chips, and never loose in a drawer with other tools.
  • Dropped instruments go to the quarantine box until checked, whatever they read afterward.
  • Measurements near the limit of a tight tolerance are made with the part and the gauge at the same temperature, near the reference temperature; parts fresh from the machine are allowed to soak.
  • Adjustable instruments are protected from adjustment that would invalidate the setting (seals or tamper-evident labels where adjustment is possible).

Training the people who measure

Most measurement errors are made by people using good instruments in different ways. Competence for measuring is part of each role's competence (7.2), and it is cheap to build:

RoleWhat they need to be able to doHow we show it
Operators who self-inspectChoose the right instrument; zero and check it; measure the feature where the drawing means; record the instrument IDSign-off by an inspector on three real parts; included in gauge studies
InspectorsAll of the above, plus reading the drawing's datums, temperature effects, attribute gauges, and when to stop a gaugePractical test on boundary parts; attribute agreement studies
Calibration coordinatorReading a certificate; checking traceability and uncertainty; the out-of-tolerance pathSupervised review of the first ten certificates
Quality engineersImpact assessments; gauge study design and interpretation; uncertainty basicsA worked assessment and study reviewed by the quality manager
CMM programmersDatum setup, program verification, change controlA verified program reviewed by a second programmer

Need more than one resource, or not sure where to start? Book a complimentary 30-minute Aegis Quality Guidance Call. We'll find the tools that fit your situation and a sensible place to start. No sales pressure, no obligation.

A management aid, not certification or a registrar audit. Using it does not by itself show conformity to AS9100D or any other standard, and your customers' requirements may add to it.

Clause numbers refer to AS9100D (SAE AS9100 Rev D) unless another document is named. The standards' text is not reproduced here: use your own licensed copy.

Aegis Insights are our own guidance, labeled wherever they appear: how we approach this work, not a requirement of any standard or customer.