The problem it solves

In most small aerospace shops the first article is treated as an inspection event: the part is made, the inspector measures it, the forms are filled in. When it goes wrong, it goes wrong for reasons decided weeks earlier: a change nobody recognized as a trigger, a part made on a prototype route, a gauge that could not resolve the tolerance, a fixture still being adjusted, a balloon missing from Form 3, a plater the customer never approved. The cost is a second first article, a late first shipment and a customer who checks everything twice. This handbook is the operating manual for the FAI and Production Readiness Kit. It treats the first article as the last step of a launch, sets out one workflow from the order to steady production, who does what, which tool to use at each stage, the weekly and monthly rhythm, and how to set it up in thirty days.

Who it is for

Quality managers and quality engineers who own first articles; manufacturing engineers, program managers and planners who launch new parts; the plant manager who chairs the readiness review.

When to use it

When first articles come back rejected or take two attempts; when you are launching more new parts than before; when a customer's scorecard or audit finds first article or change-control gaps; or before a surveillance audit, where first articles are among the records auditors sample most.

How to use this handbook

  1. Read chapters 1 to 3: why launches go wrong, the kit's tools, and the workflow they run.
  2. Agree the roles in chapter 4 with your plant manager before you change anything.
  3. Read chapter 5 for first article inspection in plain words, then chapters 6 to 13, one stage at a time.
  4. Follow the thirty-day setup in chapter 17, using the tools named at each step.
  5. Run the weekly and monthly rhythm in chapter 15 from the first week, and track the measures in chapter 16.
  6. Use the worked example in chapter 18 to see every tool used on one new part, and give your plant manager the one-page summary in chapter 19.
  7. Pin the quick reference in chapter 20 where launches are planned.

The chapters

  1. 1Why launches and first articles go wrongA first article inspection is meant to prove that the production process makes a part that meets every requirement.
  2. 2The kit and how the tools connectThe kit has eight tools that follow a part from the order to steady production, and it leans on eight related tools…
  3. 3The workflowEvery new or changed part moves through the same stages. The shaded boxes are gates: Yes continues down, No goes to…
  4. 4Who does whatA launch needs an owner for the launch as well as owners for each piece of it. Agree this table with your plant…
  5. 5First article inspection in plain wordsAS9102 sets the requirements for aerospace first article inspection: what it is, when it is required, and what the…
  6. 6Order review and first article planning (D07)The first article starts at order review. Three questions get answered for every order: what does the order require…
  7. 7Inspection planning and key characteristics (E11, D16, E07)With the drawing ballooned, the inspection plan (E11) gets one line per balloon: the requirement as the drawing states…
  8. 8The traveler (E09)The traveler carries the job from the saw to the shipping dock. It is where the inspection plan, the control plan and…
  9. 9Tooling, equipment and programs (E10)AS9100D expects production equipment, tools and software programs to be validated before they are released for…
  10. 10The production readiness review (D09)The production readiness review decides, on evidence and before the first article, whether every part of the launch is…
  11. 11First piece at every setup (E12)A first article proves the process once. A first piece proves each setup, every time.
  12. 12Running the first articleIf the planning and the readiness review were done, the first article day is short.
  13. 13Reviewing and submitting the package (D08)D08 is the review between the last measurement and the signature. It starts with counts on its Reconciliation tab…
  14. 14After approval: into steady productionApproval is not the end of the launch. Four habits keep the process where the first article proved it: Key…
  15. 15The weekly and monthly rhythmThe weekly launch review has a fixed agenda: first articles late or waiting; packages due for review; readiness…
  16. 16Measures that matterMeasure: First articles approved first time; First articles completed on the planned date; Characteristics…
  17. 17Setting it up in thirty daysDo: Agree the roles with the plant manager. Start the FAI plan log with every first article planned, open or waiting…
  18. 18Worked example: one new part through the whole kitMeridian Aerostructures received its first production order for hinge fitting 8140-220 rev A from Customer A…
  19. 19For your plant manager: one pageFill this in and hand it over. It says what changes, what you need, and what they will see.
  20. 20Quick referenceOne page to pin where launches are planned. The first article is made on the production process.
  21. 21Situations we meet oftenThe questions that come up on almost every launch, and how we answer them. Where a customer's requirement says…
  22. 22Where the kit touches AS9100D, AS9102 and AS9145Clause and document numbers only; read the requirements in your own licensed copies.

Aegis Insights: how we approach this work

Aegis Insights are our own guidance: how we approach this work and why, from years inside aerospace quality systems. They are not requirements of any standard or customer.

Definitions

TermWhat it means here
First article inspection (FAI)A complete, independent and documented verification that the production process makes a part meeting every requirement of the drawing and the order. AS9102 sets the aerospace requirements.
Full FAIA first article that verifies every characteristic.
Partial FAI (delta FAI)A first article limited to the characteristics a change could have affected, with the reason and scope recorded.
TriggerAn event that calls for a full or partial first article.
Form 1, Form 2, Form 3The AS9102 forms for part number accountability, product accountability (materials, special processes, functional tests) and characteristic accountability.
Ballooned drawingA copy of the drawing with a unique number on every characteristic and note.
CharacteristicAny dimension, tolerance, note, specification or other requirement that can be inspected or verified.
Key characteristic (KC)A characteristic whose variation significantly affects fit, function, performance, service life or producibility.
Production process verificationShowing that the production process can make parts that meet requirements (AS9100D 8.5.1.3); a first article is one way.
Production readiness reviewA structured review, before the first article, of whether everything needed to make the part is in place, ending in a recorded decision.
First pieceThe first part after a setup or a change, inspected before the run continues.
Inspection planThe record of how each characteristic is verified: where, how, how often, and what is recorded.
Control planThe document listing, for each operation, the characteristics controlled, the method, the frequency and the reaction plan.
TravelerThe document that carries a job through the shop, with every operation in sequence and space to record who did each one.
Validation (of tooling, equipment or programs)Showing, before use, that they produce parts that meet requirements.
APQPAdvanced product quality planning: a phased method for planning a new product and its process; AS9145 sets it out for aviation, space and defense.
PPAPProduction part approval process: the evidence that the production process can make the part consistently; AS9145 includes it.
Capability (Cpk)A measure of how well a process centers its output within the tolerance, compared with its variation.
LaunchThe move of a new or changed part into production.
NCRNonconformance report: the record of a nonconformity and its disposition.

Need more than one resource, or not sure where to start? Book a complimentary 30-minute Aegis Quality Guidance Call. We'll find the tools that fit your situation and a sensible place to start. No sales pressure, no obligation.

The workflow, frequencies and starting points here are our own practice. AS9102, AS9145 where it applies, and your customers' purchase orders set the actual requirements, and customers often add forms, submission systems, approval steps and shorter lapse periods; theirs come first.

A management aid, not certification or a registrar audit. Using it does not by itself show conformity to AS9100D or any other standard, and your customers' requirements may add to it.