The FAI and Production Readiness Kit HandbookChapter 13 of 22

Reviewing and submitting the package (D08)

D08 is the review between the last measurement and the signature. It starts with counts on its Reconciliation tab: balloons against Form 3 lines, lines against recorded results, key characteristics on the drawing against those flagged, nonconformances against those closed out, materials and processes against Form 2, sub-parts against Form 1. Every count that does not agree is a finding. Then thirty-four checks, section by section, answered from the package itself.

Every No is a finding with an owner and a fixed-on date; the reviewer looks again before changing it to Yes. The Summary shows the package ready to sign only when every check is answered and no finding is open. Section C of the Reconciliation tab records the review, the submission and the customer's decision.

Where packages bounce

What goes wrongThe habit that prevents it
Form 3 has fewer lines than the drawing has balloonsOne balloon per requirement, notes included; reconcile the counts first
'OK' where a value belongsValues for every variable characteristic; pass or fail only for true attribute checks
A certificate does not trace to the partCertificate numbers written on the traveler at receiving; the lot checked against the part
Revisions do not agreeOrder, drawing and part record checked side by side
Special process source not on the customer's listCustomer approval confirmed at planning, not at submission
Signed with a nonconformance openThe first article stays open until the affected characteristics are re-verified
CMM results the customer cannot readEvery CMM feature reported under its balloon number

When a customer rejects a package, D08 is also where we learn: their reasons become findings, and the habit that would have prevented each becomes a new check in the blank rows.

Need more than one resource, or not sure where to start? Book a complimentary 30-minute Aegis Quality Guidance Call. We'll find the tools that fit your situation and a sensible place to start. No sales pressure, no obligation.

A management aid, not certification or a registrar audit. Using it does not by itself show conformity to AS9100D or any other standard, and your customers' requirements may add to it.

Clause numbers refer to AS9100D (SAE AS9100 Rev D) unless another document is named. The standards' text is not reproduced here: use your own licensed copy.

Aegis Insights are our own guidance, labeled wherever they appear: how we approach this work, not a requirement of any standard or customer.