Resource Library/Product Integrity and Aerospace Requirements/Production Readiness Review Checklist

Checklist · AQL-D09

Production Readiness Review Checklist

Decide, on evidence, whether a new or changed part is ready to make product: thirty-eight readiness checks across thirteen areas, a record of the decision and its conditions, and a summary that shows what is blocking the launch.

  • Excel
  • fillable PDF
  • Worked example
  • Your logo on it
  • Aegis Insights
Page 1 of the Production Readiness Review Checklist

Page 1 of the PDF. Every resource includes a fully worked example.

The problem it solves

New parts are launched by a date, not by readiness. The first article is run while the fixture is still being adjusted, the CMM program has never seen a part, the second shift has never set up the machine, or the plater is not on the customer's list. The problems surface one at a time during the first article and the first production runs, each as a delay, a nonconformance or a late shipment. A production readiness review puts every part of the launch on one page before the first article, rates each one on evidence, turns every gap into an action with an owner and a date, and records a decision the whole team signs: go, go with conditions, or not yet.

Who uses it

Program managers, manufacturing engineers and quality engineers who launch new or changed parts; plant managers who chair the review and own the decision.

When

One to two weeks before the first article run of a new part, a part moving to a new machine or site, a restart after a long lapse, or a major process change. Again a week later when the first review ends in No go.

Free to use, change and copy, in your own organization or with your clients; add your own logo, keep the Aegis credit. Part of: FAI and Production Readiness Kit. Clause references: 8.1, 8.5.1; also 8.1.1, 8.2.3, 8.4, 8.5.1.1, 8.5.1.2, 8.5.1.3, 7.1.5, 7.2; AS9145 (APQP and PPAP) (numbers only; use your own licensed copy of the standard).

Aegis Insights inside. Wherever this resource gives our own guidance, it is labeled Aegis Insights, so you always know what is our experience and what a standard or your customer requires.

A management aid, not certification or a registrar audit. Using it does not by itself show conformity to AS9100D or any other standard.

How to put it to work

Chapters of our free guides that use this tool.

  1. The kit and how the tools connectThe FAI and Production Readiness Kit Handbook, chapter 2
  2. The workflowThe FAI and Production Readiness Kit Handbook, chapter 3
  3. The production readiness review (D09)The FAI and Production Readiness Kit Handbook, chapter 10
  4. The weekly and monthly rhythmThe FAI and Production Readiness Kit Handbook, chapter 15
  5. Setting it up in thirty daysThe FAI and Production Readiness Kit Handbook, chapter 17
  6. Quick referenceThe FAI and Production Readiness Kit Handbook, chapter 20

Related resources

  • Checklist

    First Article Inspection Planning Checklist

    Decide whether a job needs a first article and how much of one, then plan it before the part is made: requirements, the production process, the ballooned characteristics, gauges, materials, special processes, people and records, with a shop-wide log from trigger to customer approval.

    Excel · PDFFree download
  • Checklist

    AS9102 FAI Package Completeness Checklist

    Review a first article package before it is signed and sent: the part record, materials, special processes and tests, every characteristic, the ballooned drawing and the records behind it, with count reconciliations that find the missing line in minutes.

    Excel · PDFFree by email
  • Checklist

    Production Traveler Review Checklist

    Two reviews of the document that carries a job through the shop: one before the traveler is released to the floor, so it says what the drawing and the order require, and one when the job is complete, so the record shows every operation done, every part accounted for and every exception authorized.

    Word · PDFFree download
  • Workbook

    Tooling and Equipment Maintenance Register

    Keep every machine, fixture, tool, customer-owned item and NC program that the product depends on validated, maintained and checked in storage, with a log that asks what a breakdown made while it was broken.

    Excel · PDFFree download
  • Workbook

    Inspection Planning Worksheet

    Plan the inspection of every ballooned characteristic before the first part is made: where it is verified, by which method and gauge, how often, what gets recorded and what happens when it is out, with a check that every gauge can resolve its tolerance.

    Excel · PDFFree download
  • Checklist

    First-Piece Inspection Checklist

    Release every setup on evidence: nineteen setup checks, the first piece measured characteristic by characteristic with fail and near-limit flags, a suggested decision, and a shop-wide log that shows which setups keep needing a second try.

    Excel · PDFFree download