Free quality tools from Aegis: templates, kits and guides you can use today →

Resource Library/Aegis Quality Kits/Configuration and Change Control Kit

Aegis Quality Kit · 5 tools and the handbook

Configuration and Change Control Kit

One change traced from the drawing to the machine: impact assessment, configuration records and documented information control.

Get it freeThe Word and fillable PDF versions, sent to your work email.Read the handbook online

Start with the handbook: it sets out the workflow, who does what, the weekly rhythm, a 30-day setup plan and one worked example that runs through every tool below.

Page 1 of The Configuration and Change Control Kit Handbook

The kit, step by step

Each tool is free on its own page, with its own worked example from the same story.

  1. 1
    Workbook · AQL-D10

    Configuration Management Register

    Every part at its released configuration (drawing, specifications, router, programs, inspection plan, key characteristics and FAI, each with its revision), how it got there, and checks at the machine that what is built matches what is released.

  2. 2
    Workbook · AQL-D11

    Engineering Change Impact Assessment

    Assess every drawing, specification, order or engineering change before anything moves: twenty impact areas, effectivity and old-revision product, product safety, FAI, the customer question, every action to done, and a log of every change.

  3. 3
    Workbook · AQL-A13

    Documented Information Control Register

    Every controlled document with its revision, approval, points of use and review date; every revision issued and whether the old copies came back; external documents checked against their source; spot checks where documents are used; and the records you keep and for how long.

  4. 4
    Workbook · AQL-C14

    Supplier Change Notification Register

    Log every change your suppliers make to site, process, source, material, people or ownership; check your purchase order and your customer's requirements; decide with a first article where needed; and verify the first lot made after the change.

  5. 5
    Workbook · AQL-E13

    Manufacturing Process Change Assessment

    Assess every change to how a part is made or inspected before it reaches production: a risk screen, the customer's notice and approval, a validation plan with its criterion set first, the trial, the FAI, and a watch over the first lots, with every change on one log.

Read the handbook online

All 19 chapters are free to read on the site. Start with the overview.

  1. 1Why changes go wrong in small shops
  2. 2Three controls, one system
  3. 3The kit at a glance
  4. 4Who does what
  5. 5The change board
  6. 6Configuration identification: what a part is
  7. 7Customer and engineering changes
  8. 8Process changes
  9. 9Supplier changes and flow-down
  10. 10Documented information control
  11. 11Electronic control of programs and documents
  12. 12When an old revision gets through
  13. 13Running the system
  14. 14Setting it up in thirty days
  15. 15Worked example: one change through the whole kit
  16. 16What auditors ask, and where the answer is
  17. 17For your general manager: one page
  18. 18Quick reference
  19. 19Where the kit touches AS9100D

The problem it solves

In a small aerospace shop, configuration, change and document control usually live in three places with three owners: engineering files the drawing, the programmer updates the program, document control issues the new work instruction, and nobody owns the line between them. Changes arrive by email, get implemented by memory, and are finished when the drawing is filed. The result is the most common and most avoidable nonconformance in machining: perfect parts made to a superseded revision, because an old program, setup sheet or characteristic list was still at the machine. This handbook is the operating manual for the Configuration and Change Control Kit. It sets out one system: what a part's configuration is, how every kind of change moves through it, how documents and programs follow it to the floor, who does what, the weekly and monthly rhythm, a thirty-day setup plan, and one real-looking change traced through every tool.

Who uses it

Quality managers and directors who own configuration and change control, engineering and manufacturing engineering leads, document control, and the general manager who sponsors the work.

When

When you have had a wrong-revision NCR or audit finding; when customer changes arrive faster than you can track them; when you take over a quality system; or a quarter before a surveillance or recertification audit.

Need more than one resource, or not sure where to start? Book a complimentary 30-minute Aegis Quality Guidance Call. We'll find the tools that fit your situation and a sensible place to start. No sales pressure, no obligation.

These tools help you run the work by hand. When you want the whole picture of your quality system from the records you already keep, that's what the AeroAssure Audit Defense Pack and the IA9100 Transition Gap Analysis do.