Engineering Change Impact Assessment

Assess every drawing, specification, order or engineering change before anything moves: twenty impact areas, effectivity and old-revision product, product safety, FAI, the customer question, every action to done, and a log of every change.

Get it freeThe Excel and fillable PDF versions, sent to your work email.
  • Excel
  • fillable PDF
  • Worked example
  • Your logo on it
  • Aegis Insights
Page 1 of the Engineering Change Impact Assessment

Page 1 of the PDF. Every resource includes a fully worked example.

The problem it solves

A customer releases a new drawing revision. The drawing gets filed, and the rest of the change happens by memory: someone updates the program, someone else may update the inspection plan, the setup sheet in the cell stays at the old revision, a gauge arrives with no calibration record, and the lot in work is finished to whichever revision the operator had. Weeks later an NCR says 'made to superseded revision'. This workbook makes the change go through one assessment: twenty impact areas answered, the effectivity point and what happens to old-revision product, the product-safety and FAI decisions, every action tracked to done with evidence, and a closure that will not read Yes until the old revision is gone from every point of use.

Who uses it

Quality and engineering leaders who run change control, document control, manufacturing engineers, and the change review board.

When

Open an assessment the day a change arrives (a drawing or specification revision, an order amendment, an internal engineering change, a corrective action that changes the product or its documents), approve it before anything moves, and close it after the first product at the new revision is verified.

Free to use, change and copy, in your own organization or with your clients; add your own logo, keep the Aegis credit. Part of: Configuration and Change Control Kit. Clause references: 8.5.6, 8.1.2 (with 8.2.4, 8.1.3, 8.5.1.3) (numbers only; use your own licensed copy of the standard).

Aegis Insights inside. Wherever this resource gives our own guidance, it is labeled Aegis Insights, so you always know what is our experience and what a standard or your customer requires.

A management aid, not certification or a registrar audit. Using it does not by itself show conformity to AS9100D or any other standard.

How to put it to work

Chapters of our free guides that use this tool.

  1. The kit and how the tools connectThe FAI and Production Readiness Kit Handbook, chapter 2
  2. Three controls, one systemThe Configuration and Change Control Kit Handbook, chapter 2
  3. Order review and first article planning (D07)The FAI and Production Readiness Kit Handbook, chapter 6
  4. The kit at a glanceThe Configuration and Change Control Kit Handbook, chapter 3
  5. After approval: into steady productionThe FAI and Production Readiness Kit Handbook, chapter 14
  6. Who does whatThe Configuration and Change Control Kit Handbook, chapter 4

Related resources

  • Kit handbook

    The Configuration and Change Control Kit Handbook

    One working system for knowing exactly what each part is, changing it on purpose, and making sure every document and program on the floor says the same thing: configuration identification, customer, engineering and process change control, and documented information control, joined up.

    Word · PDFFree by email
  • Workbook

    Configuration Management Register

    Every part at its released configuration (drawing, specifications, router, programs, inspection plan, key characteristics and FAI, each with its revision), how it got there, and checks at the machine that what is built matches what is released.

    Excel · PDFFree download
  • Workbook

    Documented Information Control Register

    Every controlled document with its revision, approval, points of use and review date; every revision issued and whether the old copies came back; external documents checked against their source; spot checks where documents are used; and the records you keep and for how long.

    Excel · PDFFree download
  • Workbook

    Manufacturing Process Change Assessment

    Assess every change to how a part is made or inspected before it reaches production: a risk screen, the customer's notice and approval, a validation plan with its criterion set first, the trial, the FAI, and a watch over the first lots, with every change on one log.

    Excel · PDFFree download
  • Workbook

    Supplier Change Notification Register

    Log every change your suppliers make to site, process, source, material, people or ownership; check your purchase order and your customer's requirements; decide with a first article where needed; and verify the first lot made after the change.

    Excel · PDFFree download
  • Workbook

    Key Characteristics Monitoring Register

    Every key characteristic with its limits, control method and reaction plan; every measured value; and capability worked out from the values, so you know which KCs are capable, which are not, and which have too little data to say.

    Excel · PDFFree download

Need more than one resource, or not sure where to start? Book a complimentary 30-minute Aegis Quality Guidance Call. We'll find the tools that fit your situation and a sensible place to start. No sales pressure, no obligation.

These tools help you run the work by hand. When you want the whole picture of your quality system from the records you already keep, that's what the AeroAssure Audit Defense Pack and the IA9100 Transition Gap Analysis do.