Free quality tools from Aegis: templates, kits and guides you can use today →

← The Aegis Quality Resource Library

AQL-B11 · Corrective Action, Problem Solving and Complaints

Containment and Corrective Action Verification Checklist

Two checklists: one to confirm containment reached every suspect part, wherever it is, and one to confirm a corrective action is in place where the work is done and has worked, before anyone signs it closed.

Free to use, change and copy inside your own organization. Editable Word, plus a fillable PDF you can complete on screen.

The problem it solves

Containment gets called complete once the parts on the shop floor are sorted, while suspect product sits in finished goods, at an outside processor, in transit or on the customer's shelf. Corrective actions get closed when the record says the action is done, with nobody checking that the work instruction changed at the machine, the old copy came out of the binder, or the problem actually stopped. These two checklists make both decisions on evidence: every location named and checked, and every action seen in use and measured against the criterion set before it went in.

Who uses it, and when

Quality engineers and quality managers who sign containment complete or authorize a corrective action's closure; internal auditors sampling the corrective action process. Checklist 1 when containment is reported complete, and before you tell a customer it is. Checklist 2 before the closure signature on any corrective action, CAR or 8D.

Part of

CAPA Command Kit, MRB and Nonconformance Kit.

Clause references: 8.7.1, 8.7.2, 10.2.1, 10.2.2. Clause numbers only; the standards text is not reproduced, use your own licensed copy.

Aegis Insights inside. Wherever this resource gives our own guidance, it is labeled Aegis Insights, so you always know what is our experience and what a standard or your customer requires.

A management aid, not certification or a registrar audit. Using it does not by itself show conformity to AS9100D or any other standard.

Page 1 of the Containment and Corrective Action Verification Checklist

Page 1 of the PDF. Every resource includes a worked example.

Related resources

These tools help you run the work by hand. When you want the whole picture of your quality system from the records you already keep, that's what the AeroAssure Audit Defense Pack and the IA9100 Transition Gap Analysis do.